Simulation Q&A

It was June 1989 at an ASHRAE conference in Vancouver when the idea of a National Fenestration Rating Council was born. Thirty-three years later, much has changed. Something that has not changed is the value that window simulations continue to provide to manufacturers, designers and clients. For a fraction of the cost of physical apparatus, computer modelling can be completed leading to very accurate results when compared to physical hot-box testing. In this article, I’ve chosen to interview my colleague Zeljka Lazarevic asking her a few questions about her career working in the industry.

DH: Zeljka, how many years have you been doing this?

ZL: I’ve been working in the window industry for the past 25 years. I started with Enermodal Engineering here in Kitchener, Ont., and over time have grown along with the company to be a part of WSP today.

DH: What are some of the recent changes you’ve seen in the window industry over the past five years and how have these changes impacted your computer simulation work?

ZL: Our industry is continuing to innovate and improve. I have seen many manufacturers pushing new technologies. Because of the drive towards net zero buildings, many have realized that smaller changes are not good enough anymore. It’s not enough just to take your existing frames and add a low-E coating or new spacer. Entirely new frames are needed, comprised of various materials and a range of new technologies.

DH: What is the hardest part of simulations your team completes using the THERM simulation software developed at the Lawrence Berkeley National Laboratory?

ZL: Becoming familiar with the software is an adjustment at first. But once you are familiar with it, it’s not that hard. Sometimes what takes time is compiling all of the information that is required together. Sometimes window manufacturers do not have the required drawings or all of the information they need to pass along to us. As an accredited NFRC simulation laboratory, every two years we are required to pass an audit so that also takes some time. All of this is required so manufacturers can get U-factor, SHGC, VT and CR ratings necessary for building energy code compliance.

DH: Why would someone want to get into the window simulation industry?

ZL: My simple answer would be to help clients improve their fenestration products. We all want to build better buildings and for me that includes providing technical advice to manufacturers related to their research and development. A career in the window simulation industry also allows for career progression. A few steps one can take include becoming an NFRC certified simulator and even becoming a simulator in responsible charge.

DH: What are the shortest and longest projects you’re currently working on?

ZL: Some trials projects can take only a couple of hours. A repeat client may call us and ask for some assistance with a new component they are developing. But we also have $50,000 projects that can take our team two to four months to complete. It all depends.

DH: What do you know now that you wish you knew 25 years ago?

ZL: I wish I had all this experience. When I started I didn’t know how some very small changes can substantially impact the performance of a window or curtainwall system. A small piece of advice can have a huge impact.

DH: Thanks, Zeljka, for sharing this with me today and for serving our industry over the past 25 years.

When I started I didn’t know how some very small changes can substantially impact the performance of a window or curtain wall system.

David Heska, P.Eng. is a director with WSP’s building sciences team in southwestern Ontario. david.heska@wsp.com.

©Annex Glass Canada. View All Articles.

The Engineer
https://magazine.glasscanadamag.com/articles/the-engineer?article_id=4233812&i=741284

Menu
  • Page View
  • Contents View
  • Advertisers
  • Website

Issue List

August 2025

June 2025

Top Glass Showguide 2025

March 2025

October 2024

August 2024

June 2024

Top Glass Showguide 2024

March 2024

October 2023

August 2023

June 2023

Top Glass Showguide 2023

March 2023

December 2022

October 2022

August 2022

June 2022

April 2022

February 2022

December 2021

October 2021

August 2021

June 2021

April 2021

February 2021

December 2020

October 2020

August 2020

June 2020

April 2020

February 2020

December 2019

October 2019

August 2019

June 2019

April 2019

February 2019

December 2018

October 2018

August 2018

June 2018

April 2018

February 2018

December 2017

October 2017

August 2017

June 2017

April 2017

February 2017

December 2016

October 2016

August 2016

June 2016

TopGlass-ShowReport-May16

April 2016

February 2016

December 2015

WINDOOR-DigitalWrap-2015

October 2015

August 2015

June 2015

Top Glass digital wrap up

April 2015

February 2015

December 2014

October 2014

August 2014

June 2014

April 2014

February 2014

December 2013

October 2013

August 2013

Top Glass, June 2013

June 2013

April 2013

February 2013

December 2012

October 2012

August 2012

June 2012

Directory 2012

May 2012

February 2012

December 2011

October 2011

August 2011

June 2011

April 2011

February 2011

December 2010

October 2010

July/August 2010

May/June 2010

March/April 2010

January/February 2010

December 2009

October 2009

August 2009

June 2009

April 09

Feb 2009

December 2008

October 08

August 2008

June 2008

April 2008


Library